Moen
Work Performed
New Construction
Location
Elyria, Ohio
Moen
J.L. Moore constructed a new Hazardous Materials Containment Room inside one of Moen’s product plants. This room required a tight seal where they could safely store products. The project included the construction of concrete dikes, steel framing, corrugated metal siding, and roof. Construction occurred simultaneously with plant operations requiring extra attention to safety and cleanliness. Throughout construction, the project was required to remain dust free outside of the immediate work area to protect the plant employees as well as the integrity of their products.